Skip to content

Cart

Your cart is empty

Men's Curved Basketball Shoes With Thick Soles

Sale price$95.98

Complete with eyelets and a lace up closure for a classic look

  • The upper is made of PU and the sole is made of Rubber
  • Feature: Fashion Trend, Anti-Slippery, Hard-Wearing, Shock- Absorbent
  • Season: Autumn, Spring, Summer, Winter
  • Occasion: Outdoor, Sports
  • Gender: Men
  • Care Instruction: Spot clean only
  • This product is made on demand. No minimums
  • Multiple shipping options available, and cost varies on time efficiency.

Size Guide

 

EUR Size US Size Insole Length(inch) Insole Length(mm)
39 6 9.9 251
40 7 10.2 259
41 8 10.5 266
42 8.5 10.6 270
43 9.5 10.9 278
44 10 11.1 283
45 11 11.4 290
46 12 11.7 296
47 12.5 11.9 303
48 13 12.2 311
49 14 12.5 318
50 15 12.7 323

 

Product measurements may vary by up to 3~5mm

Color:White
Shoe size:
ADS-3SMSHD05-NFVCL-FFFFFF
Men's Curved Basketball Shoes With Thick Soles Sale price$95.98